Important projects
RC Medovyi
Petra Radchenko Str., 27
Work Description
Construction and reconstruction of the water supply system, domestic sewage, and storm sewer outdoor networks, heat network
Construction period
October 2019 - March 2021
Construction methods/technologies
Excavating with partial ground stabilization. Tunnelling with dehydration
Putting networks into operation
Put into operation
Contact Us
1, MAHNITOHORSKA STR, KYIV
•
(044) 337 07 17,
(097) 337 07 17
(097) 337 07 17
•
FB - @gesgroupua