Reconstruction of storm collector. Construction of the pre-unloading bed block to Lybid River

Nadniprianske Shose Str., 2-A

Work Description

Construction and reconstruction of the water supply system, domestic sewage, and storm sewer outdoor networks

Work type

  • K2
    Storm sewer (K2)
    Diameter:
    1000 - 2000 mm
    Length:
    1250.0 m
    Burial depth:
    2.9 - 4.8 m
    Pipe material:
    Polyethylene, Iron contrete
Construction period
2021
Construction methods/technologies
Excavating with partial ground stabilization
Putting networks into operation
In the process of putting into operation